• Site Map
  • Accessibility Links
  • English
Close

Order granting permission to open the sluice valve and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam – 04.08.2025.

Order granting permission to open the sluice valve and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam – 04.08.2025.
Title Date View / Download
Order granting permission to open the sluice valve and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam – 04.08.2025. 04/08/2025 View (4 MB)