Close

Order granting permission to open the spillway shutters and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam.

Order granting permission to open the spillway shutters and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam.
Title Date View / Download
Order granting permission to open the spillway shutters and release excess water into the Chalakudy River to adjust the water level in the Poringalkuthu Dam. 22/10/2025 View (3 MB)