Disaster Management Warnings
Filter Document category wise
Title | Date | View / Download |
---|---|---|
To ensure that the floating bridge at Chavakkad Beach under Chavakkad Municipality limits is functioning as per adequate standards -regarding. | 05/10/2023 | View (214 KB) |
Regarding the order giving permission to release excess water from Poomala Dam | 27/09/2023 | View (4 MB) |
Regarding adjustment of water level in Enamaw regulator | 08/09/2023 | View (280 KB) |
African Swine Fever – Regarding Precautionary Measures | 01/08/2023 | View (2 MB) |
Regarding availability of vehicles on contract basis for disaster relief operations | 24/07/2023 | View (74 KB) |
Regarding availability of vehicles on contract basis for disaster relief operations | 12/07/2023 | View (70 KB) |
Regarding the removal of the temporary bund in front of the Enammaw regulator | 07/07/2023 | View (2 MB) |
Regarding release of excess water from Peringalkuth Dam into Chalakudy River | 07/07/2023 | View (256 KB) |
Regarding opening the spillway shutters of Chimney Dam to let out excess water | 06/09/2022 | View (9 MB) |
Regarding discharge of excess water from Sholayar Dam to Chalakudy river through Peringalkuth Dam – 06/09/2022 | 06/09/2022 | View (1 MB) |