Disaster Management Warnings
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Regarding adjustment of water level in Enamaw regulator | 08/09/2023 | View (280 KB) |
| African Swine Fever – Regarding Precautionary Measures | 01/08/2023 | View (2 MB) |
| Regarding availability of vehicles on contract basis for disaster relief operations | 24/07/2023 | View (74 KB) |
| Regarding availability of vehicles on contract basis for disaster relief operations | 12/07/2023 | View (70 KB) |
| Regarding the removal of the temporary bund in front of the Enammaw regulator | 07/07/2023 | View (2 MB) |
| Regarding release of excess water from Peringalkuth Dam into Chalakudy River | 07/07/2023 | View (256 KB) |
| Regarding opening the spillway shutters of Chimney Dam to let out excess water | 06/09/2022 | View (9 MB) |
| Regarding discharge of excess water from Sholayar Dam to Chalakudy river through Peringalkuth Dam – 06/09/2022 | 06/09/2022 | View (1 MB) |
| Regarding discharge of excess water from Sholayar Dam to Chalakudy river through Peringalkuth Dam | 01/09/2022 | View (2 MB) |
| Disaster Management | 04/08/2022 | View (3 MB) |