Disaster Management Warnings
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Connolly Canal – Reassessment Report | 29/01/2024 | View (6 MB) |
| Chinganatkadav Bridge across Connolly Canal – Social Impact Assessment Study – Final Document | 20/11/2023 | View (3 MB) |
| Water entering the houses in Poonkunnam, Ayanthol and Puturkara divisions in Thrissur Corporation. regards- | 07/11/2023 | View (154 KB) |
| Quotation notice – Regarding provision of vehicles on rate contract basis | 12/10/2023 | View (86 KB) |
| To ensure that the floating bridge at Chavakkad Beach under Chavakkad Municipality limits is functioning as per adequate standards -regarding. | 05/10/2023 | View (214 KB) |
| Regarding the order giving permission to release excess water from Poomala Dam | 27/09/2023 | View (4 MB) |
| Regarding adjustment of water level in Enamaw regulator | 08/09/2023 | View (280 KB) |
| African Swine Fever – Regarding Precautionary Measures | 01/08/2023 | View (2 MB) |
| Regarding availability of vehicles on contract basis for disaster relief operations | 24/07/2023 | View (74 KB) |
| Regarding availability of vehicles on contract basis for disaster relief operations | 12/07/2023 | View (70 KB) |